Sample build by Elite Spec for Total Stopping Limited. Patrick, claim it within 30 days, say the word.
recent jobs

A few of the rooms.

Real Waikato jobs Pat has finished, commercial fit-outs, architectural builds, show homes, and weekend-warrior reno work.

Commercial office fit-out for Waipa Civil by Higgs Building Co, gib walls stopped and ready for paint Higgs Building Co · Cambridge · Nov 2022

Waipa Civil offices

Pat's crew did the interior gib stopping on the new Waipa Civil commercial offices, on behalf of Higgs Building Co. Higgs is a Certified Passive House Builder, passive-house interiors don't forgive sloppy stopping, so the standard had to be tight.

GV Homes architectural build in Raglan, scaffolded interior with vaulted ceiling and estuary view GV Homes · Raglan · Oct 2022

Raglan estuary build

An architectural build by GV Homes on the Raglan estuary, vaulted ceiling, floor-to-ceiling glazing, long ceiling joins that would have showed up under the estuary light if they hadn't been right. GV Homes went on to win the 2024 Bunnings New Home House of the Year in Waikato.

Show home interior, gib walls stopped, scaffold tower centred in the room Show home · Jul 2024

Show home, mid-build

Show-home work for a Waikato builder. Show homes go through the photo grind, every wall has to hold up to a wide-angle lens. Pat stops to that bar by default.

Open-plan kitchen living mid-build, paper-tape joins visible First job of 2025 · Jan 2025

Open-plan kitchen finish-up

Big open-plan kitchen and living, taped and stopped, ready for the painter on the day. The first job back after the summer break.

Two-pitch vaulted ceiling, freshly stopped, sliding door to rural view New build · rural Waikato

Two-pitch vaulted living

Two-pitch vaulted ceiling on a rural new build. Long rakes, clean cornice line, no waves at the apex join.

Bedroom with stopped gib walls and two windows looking out to a fence line Renovator help · Cambridge

Bedroom finish-up

Homeowner put the gib up at the weekend. Pat came in behind, stopped the lot, sanded back, and handed it over paint-ready.

Interior under scaffolding with ladder, white-stopped ceiling and exposed rafter detail New build · 2024

Exposed-rafter ceiling

Architectural detail work, stopping in around exposed rafters without overrunning the timber line. Patience job.

Living room mid-build with raw gib walls, scaffold tower and tools visible Mission completed · Jul 2024

Mid-stud living room

Full-room stop in a mid-stud living space. Tools out, walls up, paint-ready face by handover.

Got a similar room?

Ring Pat with a few photos and a rough square metre figure.